Bestech Installation Steps

Bestech Installation Steps

Step 1: Feasibility Study

  • Site study, local permitting requirements, different renewable energy options, preliminary cost estimates, and financing

Step 2: Design of Renewable Energy System

  • System specifications, PV area and foundation, storage battery capacity, electric wiring and controls, schedule and installation costs

Step 3: Installation of Solar System

  • Procurement of components, site preparation, installation of PV panels and auxiliary components, and electric wiring

Step 4: Commissioning